Process
06 phases

First walk to the keys.

A house usually takes us between two and three years. Here is how that time is spent, what you receive at each stage, and how our fee follows the work.
Typical length
24–36Months, for a new house
Site visits
WeeklyA partner on site through the build
Phases
06Each with clear outputs
First visit
FreeWithin Portugal
Phases

Six phases, one partner.

The same partner leads every phase, from the first site walk to the return visit a year after handover.

  1. 011–2 weeks

    First visit

    Walking the site together.

    We meet you on site, ideally twice: once in the morning and once late in the day. We listen, measure, photograph and draw the sun. There is no fee for the first visit within Portugal.

    What you get

    • Site notes and photographs
    • Initial light study
    • A written brief in your words
    The shore wall, Dunas Pavilion
    The shore wall, Dunas Pavilion
  2. 023–6 weeks

    Feasibility

    What the site allows.

    We review planning rules, heritage constraints, ground conditions and budget, then test three different approaches in quick massing models.

    What you get

    • Planning and heritage review
    • Three massing options
    • Rough cost plan
    Window slots, Biblioteca Norte
    Window slots, Biblioteca Norte
  3. 036–10 weeks

    Concept

    One idea, drawn well.

    We develop a single direction in plans, sections and card models, and bring material samples to the table. This is where the building finds its character.

    What you get

    • Concept drawings and model
    • Material samples
    • Updated cost plan
    Pool terrace, Casa do Arco
    Pool terrace, Casa do Arco
  4. 043–9 months

    Planning

    Making the case.

    We prepare and submit the planning application, meet the municipality, and respond to consultations. Timing depends mostly on the authority, and we tell you honestly what to expect.

    What you get

    • Planning application
    • Heritage statement
    • Consultation responses
    Courtyard, Museu da Luz
    Courtyard, Museu da Luz
  5. 053–5 months

    Technical design

    Every joint, resolved.

    With engineers and consultants, we detail the building fully: structure, services, joinery and finishes. Then we tender the work among builders we trust.

    What you get

    • Construction drawings
    • Specifications
    • Tender report and contract
    Stair and light well, Escada House
    Stair and light well, Escada House
  6. 0610–20 months

    Construction & handover

    On site, every week.

    A partner visits site weekly, chairs progress meetings and inspects the work. At handover we walk the house with you, and we come back a year later to see how it lives.

    What you get

    • Weekly site reports
    • Handover manual
    • One-year return visit
    The pool at handover, Hotel Salina
    The pool at handover, Hotel Salina
What it costs

A fee that follows the work.

Our full-service fee is a percentage of construction cost, usually between 9% and 13%, divided across the phases below.

  • 01First visit

    No fee

    —Within Portugal; travel charged abroad
  • 02Feasibility

    €6,500

    FixedCredited against the full fee if you continue
  • 03Concept

    €14,000

    20%Includes one round of changes
  • 04Planning

    €10,500

    15%Excludes municipal fees
  • 05Technical design

    €24,500

    35%Includes tender and contractor selection
  • 06Construction & handover

    €21,000

    30%Billed monthly through the build
Total fee
€70,000100% · plus VAT at 23%

Consultants (structural, services, lighting) are appointed by you directly, on our recommendation, typically adding 3–5% of construction cost.

Interiors and furniture are quoted separately once the concept is agreed. See Interiors.

First visit

The first visit is on us.

Send us your site and a few lines about what you hope for. We will suggest a morning and an evening to walk it together.

Book a first visit
No fee within Portugal